| SpraySaver® - Economic Analysis |
|
Sample Economic Analysis An important business component of the SpraySaver® is the amount of time and consumable you will save by having a streamlined operation. That means…..minimizing the amount of time and/or the number of time the driver is required to get out of his truck and more closely regulating the amount of material/release agent being sprayed into the bed. The SpraySaver can have a tremendous impact of this and can immediately begin to produce a positive result. We’ve laid out below a conservative estimate on the time benefits and consumables savings. Average Time Savings Per Load: 3 minutes Average Load Size: 24 Ton Cost Savings Per Ton*: 13.5 cents ($0.135) Plant Production Savings Per Ton Cost Savings Per Year 100,000 TON/YEAR $.135 PER TON $13,500 125,000 TON/YEAR $.135 PER TON $16,875 150,000 TON/YEAR $.135 PER TON $20,250 175,000 TON/YEAR $.135 PER TON $23,625 200,000 TON/YEAR $.135 PER TON $27,000 250,000 TON/YEAR $.135 PER TON $33,750
|
|
Your release agent will also last longer:
Stretching a 55 gallon drum to * (Based on Average National Truck Cost of $65.00 per hour or $1.08 ˘ per minute: $1.08 ˘ x 3 minutes / 24 ton = .135˘)
|